PageWriter TC70 US Government all
PageWriter - TC70 government Bundle w trolley
Device Description
A device intended to be used by a healthcare professional in a clinical setting to acquire and process the electrical activity of the heart for digital display in the form of a graph, to assist a physician in assessing electrical cardiac physiology [electrocardiography (ECG)]. It is designed for recording the electrical signal from two or more configurations of electrodes (ECG-leads) at a time (multichannel) and may be intended for resting ECG and/or stress/exercise ECG. It will either include an integrated display or be designed to transmit ECG data to an off-the-shelf device for display; ECG electrodes may be included. Data interpretation and/or telemetry features might also be included.
Environmental Conditions
No Data Available
Device Sizes
No Data Available
Device Sterilization
Device Sterile: False
Sterilization Prior To Use: False
Sterilization Methods: No Data Available
Product Codes
Code: DPS
Device Name: Electrocardiograph
Device Class: 2
Physical State: N/A
Definition: N/A
Submission Type ID: 1
Review Panel: CV
Review Code: N/A
Technical Method: N
Gmp Exempt Flag: N/A
Life Sustain Support Flag: N
Unclassified Reason: N/A
Implant Flag: N
Target Area: N/A
Regulation Number: 870.2340
Third Party Flag: Y
Medical Specialty: CV
Device IdentifiersDevice Id: 00884838032514
Device Type: Primary
DeviceId Issuing Agency: GS1
Contains DI Number: N/A
Package Quantity: N/A
Package Discontinue Date: N/A
Package Status: N/A
Package Type: N/A
GMDN® is a registered trademark of The GMDN Agency. All rights reserved. The information provided on this site includes data supplied by The GMDN Agency ("GMDN Content"), which is used under licence from The GMDN Agency. Any data/information suppliers who wish to extract GMDN Content from this site in order to use it as a basis for creating and supporting commercial services such as alternative categorisation, alternative GMDN Term assignment, mapping to other categorisations or ontologies, or for AI training purposes, must first obtain an appropriate licence from The GMDN Agency. No such activity is permitted without a licence. For more information on obtaining a licence, please contact The GMDN Agency (https://www.gmdnagency.org/contact-us/). None of the GMDN content constitutes any endorsement, advice, representation or warranty about any specific medical devices that may be described by such content; and no representation or warranty is made in relation to instructions for use, suitability for any application, treatment or condition, regulatory status, or any properties of a particular medical device.
GMDN ®. © GMDN Agency 2005-.