Long Upgrade Kit 12
NOUN - TC ADDITIONAL LONG LEADS KIT: IEC
Device Description
A collection of noninvasive devices intended to conduct electrical signals from a patient's heart, via an electrode attached to the surface of the chest/limbs, to an electrocardiograph (ECG) machine or a patient monitoring system. It is designed as an insulated wire(s), which may additionally include a detachable or permanently attached electrode and/or cable with connector. Some types may be designed as a pre-configured array (e.g., EEG belt) to assist electrode placement. This is a reusable device.
Environmental Conditions
- 101.40
- 57.20
- 90.00
- 10.00
- 50.00
- -20.00
Device Sizes
No Data Available
Device Sterilization
Device Sterile: False
Sterilization Prior To Use: False
Sterilization Methods: No Data Available
Product Codes
Code: DSA
Device Name: Cable, Transducer And Electrode, Patient, (Including Connector)
Device Class: 2
Physical State: N/A
Definition: N/A
Submission Type ID: 1
Review Panel: CV
Review Code: N/A
Technical Method: N
Gmp Exempt Flag: N/A
Life Sustain Support Flag: N
Unclassified Reason: N/A
Implant Flag: N
Target Area: N/A
Regulation Number: 870.2900
Third Party Flag: Y
Medical Specialty: CV
Device IdentifiersDevice Id: 00884838015005
Device Type: Primary
DeviceId Issuing Agency: GS1
Contains DI Number: N/A
Package Quantity: N/A
Package Discontinue Date: N/A
Package Status: N/A
Package Type: N/A
