Long leadset for Stress system. 10-lead, AAMI color-coding, grabbers.


Product Overview

Long leadset for Stress system. 10
NOUN - 12L Leadset, Grabber, AAMI Long


Device Description

A collection of noninvasive devices intended to conduct electrical signals from a patient's heart, via an electrode attached to the surface of the chest/limbs, to an electrocardiograph (ECG) machine or a patient monitoring system. It is designed as an insulated wire(s), which may additionally include a detachable or permanently attached electrode and/or cable with connector. Some types may be designed as a pre-configured array (e.g., EEG belt) to assist electrode placement. This is a reusable device.


Environmental Conditions

No Data Available


Device Sizes

No Data Available


Device Sterilization

Device Sterile: False

Sterilization Prior To Use: False

Sterilization Methods: No Data Available


Product Codes

Code: DSA

Device Name: Cable, Transducer And Electrode, Patient, (Including Connector)

Device Class: 2

Physical State: N/A

Definition: N/A

Submission Type ID: 1

Review Panel: CV

Review Code: N/A

Technical Method: N

Gmp Exempt Flag: N/A

Life Sustain Support Flag: N

Unclassified Reason: N/A

Implant Flag: N

Target Area: N/A

Regulation Number: 870.2900

Third Party Flag: Y

Medical Specialty: CV


Device Identifiers

Device Id: 00884838029156

Device Type: Primary

DeviceId Issuing Agency: GS1

Contains DI Number: N/A

Package Quantity: N/A

Package Discontinue Date: N/A

Package Status: N/A

Package Type: N/A


GMDN® is a registered trademark of The GMDN Agency. All rights reserved. The information provided on this site includes data supplied by The GMDN Agency ("GMDN Content"), which is used under licence from The GMDN Agency. Any data/information suppliers who wish to extract GMDN Content from this site in order to use it as a basis for creating and supporting commercial services such as alternative categorisation, alternative GMDN Term assignment, mapping to other categorisations or ontologies, or for AI training purposes, must first obtain an appropriate licence from The GMDN Agency. No such activity is permitted without a licence. For more information on obtaining a licence, please contact The GMDN Agency (https://www.gmdnagency.org/contact-us/). None of the GMDN content constitutes any endorsement, advice, representation or warranty about any specific medical devices that may be described by such content; and no representation or warranty is made in relation to instructions for use, suitability for any application, treatment or condition, regulatory status, or any properties of a particular medical device.

GMDN ®. © GMDN Agency 2005-.
Educational Resources
Videos