Includes A02 Cardiograph+A0X A Format+D01 All Orders (incl Manual Orders)+D02 ADT Support+D03 DXL ECG Interpretation+D05 ECG Full disclosure+D06 ECG Archive+D08 DICOM ECG result output+D12 Last ECG InterAct Query+D24 Wireless 802 11+D50 A.07.05 (CE7)+E06 Double Sided Tab Clips+H15 Second Battery+H16 Membrane Keyboard+H21 PIM 12 Lead+H23 Long Lead Wires+W02 Bench Repair+M2481A+13943B 10 packs+860309 B01 Partially Assembled Trolley+C02 Storage Bin+C04 Wire Basket


Product Overview

Includes A02 Cardiograph+A0X A Format+D01 All Orders (incl Manual Orders)+D02 ADT Support+D03 DXL ECG Interpretation+D05 ECG Full disclosure+D06 ECG Archive+D08 DICOM ECG result output+D12 Last ECG InterAct Query+D24 Wireless 802 11+D50 A.07.05 (CE7)+E06 Double Sided Tab Clips+H15 Second Battery+H16 Membrane Keyboard+H21 PIM 12 Lead+H23 Long Lead Wires+W02 Bench Repair+M2481A+13943B 10 packs+860309 B01 Partially Assembled Trolley+C02 Storage Bin+C04 Wire Basket
PageWriter - TC50 Government Bundle With Trolley


Device Description

A device intended to be used by a healthcare professional in a clinical setting to acquire and process the electrical activity of the heart for digital display in the form of a graph, to assist a physician in assessing electrical cardiac physiology [electrocardiography (ECG)]. It is designed for recording the electrical signal from two or more configurations of electrodes (ECG-leads) at a time (multichannel) and may be intended for resting ECG and/or stress/exercise ECG. It will either include an integrated display or be designed to transmit ECG data to an off-the-shelf device for display; ECG electrodes may be included. Data interpretation and/or telemetry features might also be included.


Environmental Conditions

No Data Available


Device Sizes

No Data Available


Device Sterilization

Device Sterile: False

Sterilization Prior To Use: False

Sterilization Methods: No Data Available


Product Codes

Code: DPS

Device Name: Electrocardiograph

Device Class: 2

Physical State: N/A

Definition: N/A

Submission Type ID: 1

Review Panel: CV

Review Code: N/A

Technical Method: N

Gmp Exempt Flag: N/A

Life Sustain Support Flag: N

Unclassified Reason: N/A

Implant Flag: N

Target Area: N/A

Regulation Number: 870.2340

Third Party Flag: Y

Medical Specialty: CV


Device Identifiers

Device Id: 00884838091689

Device Type: Primary

DeviceId Issuing Agency: GS1

Contains DI Number: N/A

Package Quantity: N/A

Package Discontinue Date: N/A

Package Status: N/A

Package Type: N/A


GMDN® is a registered trademark of The GMDN Agency. All rights reserved. The information provided on this site includes data supplied by The GMDN Agency ("GMDN Content"), which is used under licence from The GMDN Agency. Any data/information suppliers who wish to extract GMDN Content from this site in order to use it as a basis for creating and supporting commercial services such as alternative categorisation, alternative GMDN Term assignment, mapping to other categorisations or ontologies, or for AI training purposes, must first obtain an appropriate licence from The GMDN Agency. No such activity is permitted without a licence. For more information on obtaining a licence, please contact The GMDN Agency (https://www.gmdnagency.org/contact-us/). None of the GMDN content constitutes any endorsement, advice, representation or warranty about any specific medical devices that may be described by such content; and no representation or warranty is made in relation to instructions for use, suitability for any application, treatment or condition, regulatory status, or any properties of a particular medical device.

GMDN ®. © GMDN Agency 2005-.
Educational Resources
Videos