Includes A02 Cardiograph+A0X A Format+D01 All Orders (incl Manual Orders)+D02 ADT Support+D03 DXL ECG Interpretation+D05 ECG Full disclosure+D06 ECG Archive+D08 DICOM ECG result output+D12 Last ECG InterAct Query+D24 Wireless 802 11+D50 A.07.05 (CE7)+E06 Double Sided Tab Clips+H15 Second Battery+H16 Membrane Keyboard+H21 PIM 12 Lead+H23 Long Lead Wires+W02 Bench Repair+M2481A+13943B 10 packs+860309 B01 Partially Assembled Trolley+C02 Storage Bin+C04 Wire Basket


Product Overview

Includes A02 Cardiograph+A0X A Format+D01 All Orders (incl Manual Orders)+D02 ADT Support+D03 DXL ECG Interpretation+D05 ECG Full disclosure+D06 ECG Archive+D08 DICOM ECG result output+D12 Last ECG InterAct Query+D24 Wireless 802 11+D50 A.07.05 (CE7)+E06 Double Sided Tab Clips+H15 Second Battery+H16 Membrane Keyboard+H21 PIM 12 Lead+H23 Long Lead Wires+W02 Bench Repair+M2481A+13943B 10 packs+860309 B01 Partially Assembled Trolley+C02 Storage Bin+C04 Wire Basket
PageWriter - TC50 Government Bundle With Trolley


Device Description

A device intended to be used by a healthcare professional in a clinical setting to acquire and process the electrical activity of the heart for digital display in the form of a graph, to assist a physician in assessing electrical cardiac physiology [electrocardiography (ECG)]. It is designed for recording the electrical signal from two or more configurations of electrodes (ECG-leads) at a time (multichannel) and may be intended for resting ECG and/or stress/exercise ECG. It will either include an integrated display or be designed to transmit ECG data to an off-the-shelf device for display; ECG electrodes may be included. Data interpretation and/or telemetry features might also be included.


Environmental Conditions

No Data Available


Device Sizes

No Data Available


Device Sterilization

Device Sterile: False

Sterilization Prior To Use: False

Sterilization Methods: No Data Available


Product Codes

Code: DPS

Device Name: Electrocardiograph

Device Class: 2

Physical State: N/A

Definition: N/A

Submission Type ID: 1

Review Panel: CV

Review Code: N/A

Technical Method: N

Gmp Exempt Flag: N/A

Life Sustain Support Flag: N

Unclassified Reason: N/A

Implant Flag: N

Target Area: N/A

Regulation Number: 870.2340

Third Party Flag: Y

Medical Specialty: CV


Device Identifiers

Device Id: 00884838091689

Device Type: Primary

DeviceId Issuing Agency: GS1

Contains DI Number: N/A

Package Quantity: N/A

Package Discontinue Date: N/A

Package Status: N/A

Package Type: N/A


GMDN ®. © GMDN Agency 2005-2024.
Educational Resources
Videos